Command Parking Systems™ 40 years of extensive experience in the automotive aftermarket including provision of ome of the best electronic products available

Features and Benefits:

  • Assistance detecting obstacles whilst reversing your vehicle.
  • Audible alarm and optional visual display with many models.
  • Increases safety levels when children are playing near the vehicle.
  • May prevent collisions with unseen objects behind your vehicle.
  • Assists to safely park your vehicle with front and rear sensors (front sensors on selected models only).
  • Added vehicle resale value.
  • Command Parking Systems™ are a valuable addition to your vehicle.

High quality, reliable and valuable electronic vehicle accessories.

Command Parking Systems™ are manufactured in ISO approved manufacturing facilities and are covered by Command Auto Group's trusted national warranty service.

12 month warranty is applied for installations done in a DIY installation.

24month warranty is applied for units that have been installed by a professional approved installer. In a vehicle of any age.

Warranty is extended up to 3 years when installed by professional installers in new vehicles during pre-delivery.

Command Auto Group and their range of Command Parking Systems™ are continuing the leadership in innovation with new innovative products for the more unique vehicle applications.

Note: eBay's compatibility table is not accurate in some cases. Please refer to the following information we have provided for you.

Copyright © 2014 - 2026 Wesdiesel. All rights reserved.

Brand : Command

Contents :Ute Tray Reverse Parking Sensors - Fashionable Buzzer

TRUCK & UTE TRAY SENSOR SYSTEM WITH BUZZER ¨CCMD10-4

The CMD10-4 sensors are mounted by small screws. This product is ideal for those who want the protection of reversing sensors on vehicles where they may be mounted under the tray of a ute or commercial vehicle.

Suits 12V and 24V applications

Sensitivity Adjustment:

Obstruction Warning Guide:
1.5m ¨C Slow warning beep as distance decreases.
0.3m ¨C Rapid warning beep as distance decreases.

There are 2 adjustments that can be made to reduce sensor sensitivity levels.
Inner sensors ¨C for tow bar mount for example.
All sensors ¨C for spare wheels,4WD and accessories,personalised reversing applications.

These functions are controlled by the slide switch and the tuning screw on the Digital
Control Module. Please note this will reduce the maximum detection range of the sensors.

This series is available in a 4 black sensor configuration for extra ultrasonic coverage.
This system is automatically activated when reverse gear is selected.

Sensor Specifications

Sensor fitment: Tray type (saddle bracket)
Sensor colour: Matte black ¨C paintable
Sensor size: 65mm*30mm*30mm
Warning type: Audible buzzer
Detecting range: 0.2m ¨C 1.5m
Sensor adjustment: Yes ¨C slide switch (inner),adjuster screw (all)
Volume control: No
Ingress protection: Sensor IP67,module none
Connector type: Screw type to small 2 pin
Frequency: 40KHz
Power supply: 9-24v
Lead length: 2.5m (sensor to module,extension available)
Pack Includes: 4 x black tray mount sensors,1 x CMD10 module,1 x buzzer,power harness,angled rubber mounting pads to adjust sensor angle,sensor fitting kit,3M sticky backed Velcro,cable ties.

SKU Command91-W2302-AG070
Brand Command

Be The First To Review This Product!

Help other wesdiesel auto parts users shop smarter by writing reviews for products you have purchased.

Write a product review

More From This Category